Welsh Assembly – Boardwalk
Date: 01/07/2004
Company: Taylor and Sons Ltd.
     






Taylor and Sons Ltd complete the supply and installation of the Boardwalk outside the New Welsh Assembly Building in Cardiff Bay.

The new structure bridges the existing gap of old boardwalk to allow the public to walk waterside of the old dock walls for its complete length.

The structure was suspended from the old dock walls onto new piles driven into the dock basin.


Client:
Dean and Dyball who acted as Main Contractor carried out the piling.