Bristol Bridge – Refurbishment and Strengthening
Date: 01/08/2003
Company: Taylor and Sons Ltd
|
| |
|
|
|
Taylor and Sons Ltd completed the Refurbishment, Strengthening and painting of the Bridge in August 2003.
The project was a 26 week major strengthening and repainting scheme.
The bridge was a listed structure with riveted connections.
Taylor and Sons Ltd carried out the complete supply, manufacture, painting and installation.
Client:
The Main Contractor was Mowlem, the client was Bristol City Council. |
|
|
|
|
|
|
|