Total Engineering Solitions About UsMarineHighwaysRailwaysEngineeringFoundryCorrosion ProtectionPartners and LinksContact Us
 

Back to Corrosion Protection Case Studies
 
 
 
River Fowey Underbridge
Date: 10/03/2005
Company: Taylor and Sons Ltd
     




The rail over river required major strengthening and painting programme. The specification was for a full wet and dry blast to SA2.5 followed on by a RT98 M20 specification.

The work was carried out by a bird cage scaffolding during normal working hours also d T3 possessions were needed for us to carry out our works on track side working.


Client:
Main contractor Mowlem Civil Engineering and the client was Railtrack.