Drove Road Overbridge
Date: 10/03/2005
Company: Taylor and Sons Ltd
     


A major refurbishment was carried out to this road over rail bridge, the specification was for a full wet and dry blas to sa2.5 followed on by a RT98 M20 specification.

The work was completed during normal working days but many possessions were needed for the underside of the bridge. Due to the condition of the Steel Beams, prior to the blast cleaning, needle gunning and jack hammering were required.

This was necessary to remove all heavy scale and steel laminations.


Client:
Main contractor Alfred McAlpine and the client was Railtrack